background image

6505 Gayhart St., Commerce, CA 90040   |   Phone: 800.686.6672   |   www.noralighting.com   |   e-mail: [email protected]    
Instructions subject to change without notice.  © 2018

080918P3

Installation Instructions

DOUBLE WALL HOUSING

READ PRIOR TO ATTEMPTING INSTALLATION
ALWAYS TURN OFF MAIN POWER BEFORE INSTALLATION
INSTALLATION SHOULD BE CARRIED OUT BY YOUR LOCAL ELECTRICIAN

Fixtures are listed for insulated ceilings—Type IC, airtight—AT and for suspended 
ceilings—Type S. To insure safe and reliable operations, make sure the fixture 
corresponds to the proper ceiling installation. Read the following material carefully 
before beginning installation. 
In general these instructions apply to “round” housings. Drawings of “round” housings 
have been used to illustrate installation procedures. 
Before attempting installation of any recessed lighting fixture check your local electrical 
code. This code sets the wiring standards for your locality and should be carefully 
studied before starting work.
 

insUlateD ceilings - tYpe ic

Insulated Ceiling
The insulated ceiling or IC approved 
recessed fixture is one that can 
be installed in direct contact with 
insulation. 

sUspenDeD ceilings - tYpe s

Fixture can be installed in suspended 
ceilings that are not permanent or 
insulated. 

aiRtigHt installation

Nora housings certified under ASTM E283 are supplied with a pre-installed gasket or 
supplied with a ready-to-install self adhesive gasket. 
Step 1. 

Lay gasket flat and peel protective paper backing from gasket to  

 

 

expose adhesive side. 

Step 2. 

Apply supplied gasket to ceiling lip and wrap gasket around inside 

 

of housing to form seal of the ceiling opening or apply caulk per  

 

 

state/local code. When properly installed, Nora housings provide  

 

 

compliance with restricted air-flow regulations.

FiRe/electRical HaZaRD: install accoRDing to national electRic coDe anD anY 
applicaBle MUnicipal coDe ReQUiReMents. 

This equipment is intended to be installed only by qualified personnel. The installation must be 
made in accordance with the current edition to the National Electric Code and all applicable state 
and local building codes. The final installation must be approved by the appropriate qualified 
electrical/building inspector(s). Improper installation may result in a fire or electrical hazard. Be sure 
the electrical power to the circuit has been disconnected before installing this electrical system. 
For ballast replacement, a qualified electrician can replace the ballast without the cutting of wires. 
For additional details, contact technical support at 800.686.6672.

FeU / RisQUe ÉlectRiQUe: installeR selon au code électrique national et les exigences de 
coDe municipaux applicables. 

Cet équipement est destiné à être installé par un personnel qualifié. L’installation doit être faite 
conformément à l’édition actuelle du Code national de l’électricité et tous les codes d’état et 
de construction locaux applicables. L’installation finale doit être approuvée par l’inspecteur en 
électricité / bâtiment qualifié approprié (s). Une mauvaise installation peut provoquer un incendie 
ou un risque électrique. Assurez-vous que l’alimentation électrique du circuit a été coupée avant 
l’installation de ce système électrique. 
Pour le remplacement du ballast, un électricien qualifié peut remplacer le ballast sans la coupe de 
fils. Pour plus de détails, contactez le support technique au 800.686.6672.

iMpoRtant- Risk oF FiRe: 

Most dwellings built before 1985 have supply wire rated 60 degrees Celsius (thermal cutoffs in 
fixtures operate at 90 degrees Celsius); consult a qualified electrician prior to installation. If supply 
wires are located within three inches of ballast, use wire rated for at least 90oC.
A qualified electrician can replace this ballast without cutting wires. Contact technical support at 
1-800-686-6672 for additional details. 

iMpoRtant-RisQUe D’incenDie:

La plupart des logements construits avant 1985 ont le fil d’alimentation nominale de 60 degrés 

Celsius (disjoncteurs thermiques dans les appareils fonctionnent à 90 degrés Celsius); consultez 
un électricien qualifié avant l’installation. Si les fils d’alimentation sont situés à moins de trois 
pouces de ballast, l’utilisation de fil résister au moins à 90 ° C.

Un électricien qualifié peut remplacer ce ballast sans couper les fils. Contactez le support technique 

au 1-800-686-6672 pour plus de détails.

electRical connections:

1. Connect 1/2 inch trade size steel 

conduit to junction box with 
appropriate fitting. 

2. Connect -  

• Black -

 Supply Voltage 

 White -

 Neutral 

• Green Grounding J-Box Wire -

 

Copper or green grounding wire

Note oN grouNdiNg:

 Many structures carry grounding via steel conduit. If this 

is the case, if there is no grounding wire, simply leave green wire on fixture 

unattached. Fixture will be grounded through attachment of conduit to junction 

box. However, if Romex or PVC conduit is used, ground wire will always be 

present, and must be connected to green wire on fixture junction box to avoid 

electrical shock hazard.  

to install HoUsing:

Standard “JoiSt” CeilinGS: 

1) Use bar hangers to attach fixture between ceiling joists. Each end of the 

bar hanger is equipped with a nail-in barbed tab. Additional hardware 
such as screws or nails may be used if extra support 
is necessary. 

2) For steel studs, use steel piercing screws in place of 

nails or barbed tabs. 

3) Remove shipping screw from underneath side of plaster frame.

t-BaR ceilings: 

1) If mounting to a T-Bar type ceiling, mount fixture onto 

grid by placing notches on the bottom of each end of 
the bar hanger over the grid. 

2) Tie fixture to grid with structural wire going through 

both the circular knockout on the end of the bar 
hanger and nearest accompanying knockout on the 
ceiling grid.  

Note: It is imperative to tie down the fixture to prevent the fixture 
from being pushed above the ceiling during trim installation. 

cUtting a Hole:

Standard “JoiSt” CeilinGS: 

1) Locate the center of proposed 

opening on your tile or ceiling and 
mark it.

2) Use a compass to draw a circle in 

diameter around the center point. 

  Cut out 4” square hole
3) Cut along this circular line.

Reviews: