-3-
1.1
Scheme of the control unit
and check of the phases
1
Installation of the control panel
START-S19
Operating guide
37 36 35
34 33 32
31 30 29 28 27
F1
1.6 A
38 39 40 41 42 43 44 45 46 47 48 49
24 25 26
+E SGN -E
P1
P2
P3
20 21 22 23
6 7 8 9 10 11 12 13 14 15 16 17
18 19
1 2
3 4 5
JP3
JP2
F4
630
mA
START-S19 make a test of the correct running of the power, when the control pane is switched on the control panel
make a test and these are the results:
F0.F0
F1.F2
F1.F3
Single-phase connection
Three-phase connection R-S-T with
reversed sequence (the control pa-
nel reverses automatically OPEN and
CLOSE of the motor)
Three-phase connection
R-S-T in the correct sequence
5