19
GRINDING DRY PRODUCTS WITHOUT USING THE CYCLONE
1- Place the vacuum isolator (4) - if the machine is equipped with the cyclone;
2- Place the box inner cover (1);
3- Place the sieve based on the type of final product (2) insert the most curved part first;
4- Place the moveable cover on the intake chute (3);
5- Remove the back closure (5).
1- Place the smooth belt - cutting closure (2);
2- Remove the inner cover (1);
3- Remove the moveable cover of the intake chute (3);
4- Remove the back closure (5);
5- Place the vacuum isolator (4) - if the machine is equipped with the cyclone;
6- Open the blast stopper (6).
The product is placed in the intake chute or
hopper and comes out from the lower chute.
The product is placed in the intake chute and
comes out the upper outlet.
CUTTING FRESH PRODUCTS
DPM-500/1/2/4
E
n
g
li
s
h
Summary of Contents for DPM-1
Page 2: ......
Page 9: ...9 Introducing the shredder chopper and grinder DPM 500 1 2 4 E n g l i s h ...
Page 28: ...Key gauge table Torque table N mTorque unit Additional information 28 Instructions Manual ...
Page 30: ......
Page 31: ......
Page 32: ...32 Instructions Manual Essential in the field ...
Page 62: ...32 Esencial en el campo Manual de instrucciones ...
Page 63: ......