Controls
1. Lid Button
2. Lid
3. Spout Filter
4. Spout
5. Body
6. Power Base
7. Power Indicator Light
8. On/Off Switch
9. Handle
10. Water Gauge
Operations
Remove any packaging material before using your kettle for the first
time.
It is recommended before the first use to fill the kettle to the MAX level
with cold tap water, bring it to a boil and then discard the water and
repeat.
The kettle will only operate when positioned on the power base with the
On/Off Switch in the ON position. The kettle will automatically switch
off once the water has boiled.
General Operations
1. Press the Lid Button to open the lid and fill with cold tap water. Do not
exceed the MAX level.
2. Securely close the lid.
3. Plug the power cord into your power outlet.
4. Connect the kettle to the power base.
5. Push the On/Off Switch down. The Power Indicator Light turns ON and
the water will begin to boil.
6. When the water has boiled, the On/Off Switch will flick back up to the
position, and the Power Indicator Light will turn OFF.
Note: The boiling process can be interrupted at any time by manually
flicking up the On/Off Switch.
Before First Use
Not Shown
Dry Boil Protection Shut Off
ensures that the kettle
automatically switches off if
the kettle boils empty.
1
2
3
4
5
7
6
8
9
10