Technical Instructions for
Correlation Sensors
Page 62
Correlation Sensors – Rev. 07 as of 20.04.2016
®
7.4
Pressure Compensation Element for POA and CS2 Sensor
Inspect the filter element regularly when mounting POA or CS2 sensors with
pressure measurement cell and pressure compensation element (see Fig. 5-28).
Inspection intervals depend on the prevailing air humidity and may vary between
2 and 12 weeks depending on application.
If the desiccant colour should change by more than 50 % replace the filter or the
desiccant. Both can be purchased from NIVUS (see chapter 0).
7.5
Customer Service Information
For annual inspection of the entire measurement system contact our customer
service:
NIVUS GmbH - Customer Service
Phone +49 (0) 7262 9191 - 922
[email protected]
8
Dismantling/Disposal
EC WEEE-Directive logo
This symbol indicates that the Directive 2002/96/EG on waste electrical and
electronic equipment requirements shall be observed on the disposal of the
equipment.
Improper disposal may be harmful to the environment.
Always dispose equipment components and packaging materials according to
applicable local regulations on environmental standards for electronic products.