
IS-TWL-DEBUGGER Setup
TWL-06-0024-001-E
10
2008-2009 Nintendo
Released: March 17, 2009
CONFIDENTIAL
4 Setup
4.1 Connections
Set up the IS-TWL-DEBUGGER hardware using the following procedure.
Table 4-1 Setup Procedure for the IS-TWL-DEBUGGER Hardware
Step
Illustration
1.
Attach the large ferrite cores (made by
TDK Corporation) to the connectors on the
controller, and fasten them using the cable
ties (see the figure at right). Use scissors to
cut the excess portions of the ties you pulled
upward.
2.
Attach the small ferrite cores (made by
SEIWA ELECTRIC MFG. CO.,LTD.) to the
opposite side of the controller connectors,
and fasten them using the cable ties (see the
figure at right). Use scissors to cut the excess
portions of the ties you pulled upward.
3.
Attach a small ferrite core (made by
SEIWA ELECTRIC MFG. CO.,LTD.) to the
USB cable. Loop the cable approximately 30
cm from the USB-B connector and sandwich
the portion of the cable that is overlapped
with the ferrite core (see the figure at right).