
36
POSEIDON 5 NEW-NA5_en_Ver.1.0_20/12
Function
D
B3
Motor
thermal
switch.
B4
Micro
switch.
K1
Contactor.
M1
Motor.
S1
Main switch ON/OFF.
Pic. D1: Wiring diagram.
Operation of Poseidon PA 5:
Pre-conditions:
Machine hooked up to adequate water and power supply. Right Spray gun,
hose and lance/nozzle is used.
Main switch in position ”0” (OFF):
-There is main voltage at the contacts of S1 and K1.
- Machine is still off.
Main switch S1 in position ”1” (ON):
- Spray gun is closed; machine builds up pressure, if B4 (cut off pressure not reached)
and B3 (motor winding temp. Below < 160°C or < 320°F; automatic reset of B3) are closed;
if cut off pressure is reached B4 opens and the machine stops.
-If spray gun is activated pressure in unloader drops, B4 closes and starts the motor, water
flows at working pressure.
- Closing spray gun; working pressure increase in unloader till cut off pressure is reached;
B4 opens, machine stops.
Operation electrical system
Summary of Contents for Poseidon 5 Series
Page 1: ...POSEIDON 5 NA5 SERVICE MANUAL ENGLISH ...
Page 59: ...Wiring diagrams POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 59 H 106420550 ...
Page 60: ...Wiring diagrams POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 60 H 106420552 ...
Page 61: ...Wiring diagrams POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 61 H 106420554 ...
Page 62: ...Wiring diagrams POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 62 H 106420558 ...
Page 63: ...Wiring diagrams POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 63 H 106420559 ...
Page 64: ...Wiring diagrams POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 64 H 106420564 ...
Page 65: ...Wiring diagrams POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 65 H 106420566 ...
Page 67: ...67 POSEIDON 5 NEW NA5_en_Ver 1 0_20 12 Notes ...
Page 68: ...Nilfisk ALTO Division of Nilfisk Advance A S Industrivej 1 9650 Hadsund Denmark ...