GENERAL INFORMATION
ENGLISH
SERVICE MANUAL
8
9098840000
SC350
MAINTENANCE
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
WARNING!
Read carefully the instructions in the Safety chapter before performing any maintenance procedure.
The following table provides the scheduled maintenance. The intervals shown may vary according to particular working conditions,
which are to be defined by the person in charge of the maintenance.
For instructions on maintenance procedures, see the following paragraphs.
SCHEDULED MAINTENANCE TABLE
Procedure
Daily, after using
the machine
Weekly
Every six
months
Yearly
Squeegee cleaning
Brush cleaning
Tank and vacuum grid cleaning
Squeegee blade check and/or replacement
Battery charging
Screw and nut tightening check
(1)
Brush deck rubber pad check and/or replacement
Brush deck end-of-stroke cable check and/or replacement
Brush deck rubber flange check and/or replacement
And after the first 8 working hours.
(1)