2
Spin10KCE
Spin11KCE
Table of contents:
page
1
Warnings
3
2
Product description
3
2.1
Operating limits
4
2.2
Typical system
5
2.3
List of cables
5
3
Installation
6
3.1
Preliminary checks
6
3.2
Fitting SPIN
6
3.2.1
Assembly of guide supplied with SPIN10KCE
7
3.2.2
SNA11 guide assembling
8
3.2.3
Mounting the gearmotor to the guide
8
3.2.4
Mounting the gearmotor to the ceiling
8
3.3
Installation of the Various Devices
9
3.4
Electrical connections
10
3.5
Description of the electrical connections
11
4
Final checks and start up
11
4.1
Power Supply Connection
11
4.2
Recognition of the door opening and
closing positions
12
4.3
Checking door movements
12
4.4
Pre-set functions
12
4.5
Radio receiver
12
4.5.1
Memorization of Radio Transmitters
13
4.5.2
Memorization Mode I
13
4.5.3
Memorization Mode II
13
4.5.4
“Remote” memorization
14
4.5.5
Deleting the Radio Transmitters
14
5
Testing and commissioning
14
5.1
Testing
14
5.2
Commissioning
15
6
Maintenance and Disposal
15
6.1
Maintenance
15
6.2
Disposal
15
7
Additional information
16
7.1
Programming keys
16
7.2
Programming
16
7.2.1
Level one functions (ON-OFF functions)
16
7.2.2
Level one programming (ON-OFF functions)
16
7.2.3
Level two functions (adjustable parameters)
17
7.2.4
Level two programming (adjustable parameters)
17
7.2.5
Level one programming example
(ON-OFF functions)
17
7.2.6
Level two programming example
(adjustable parameters)
18
7.3
Adding or Removing Devices
18
7.3.1
STOP Input
18
7.3.2
PHOTO Input
19
7.4
Special functions
19
7.4.1
“Always open” Function
19
7.4.2
“Move anyway” Function
19
7.5
Connection of other devices
19
7.6
Troubleshooting
20
7.7
Diagnostics and Signals
20
7.7.1
Signalling with flashing light and courtesy light
20
7.7.2
Signals on the control unit
21
7.8
Accessories
21
8
Technical characteristics
22
Instructions and Warnings for users of SPIN gearmotor 25