LP21/LP22 Installation instructions en
Sensors
7
Commissioning
Prerequisites
Assembly and electrical connection
•
The system is not in use.
•
All work must be carried out by qualified specialist personnel.
•
All available cables are firmly attached to the terminal block.
•
The terminal blocks are sited on the input and output sockets of the same colour.
•
The detector is firmly mounted on the top hat rail.
Tools
Tools for the system
Always comply with the manufacturer’s instructions!
No tools are required to commission the system.
Commissioning the detector
1. Define the settings with the DIP switches.
2. Switch on the power supply to the detector.
→
The LP21/LP22 series detectors automatically run a test of the induction loops as well as a
frequency alignment.
→
The detector is ready for operation when the blue LEDs are continuously lit. There is more
information in the chapter on LED indicators.
3.
Start up all components of the system (comply with the manufacturer’s instructions).
4.
Carry out a functional test of the system (comply with the manufacturer’s instructions).
→
The detector is ready for continuous operation.
NOTE
Optimising the detector settings
The device settings can be changed using the DIP switch while it is operating.