Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be
carried out by a suitably qualified person.
Date
Signature
Notes
Description
✔
Heat pump (page 13)
Shut off valves
Venting valve
Shut off valve
Hot water (page 14)
Shut off valves
Expansion vessel
T&P valve
Tundish
Cold water (page 14)
Shut off valves
Non-return valve
Mixing valve
Safety valve
Tundish
Electricity (page 16)
Hot water sensor
Temperature limiter
Miscellaneous
Benchmark checklist
5
Chapter 1 |
Important information
VPB/VPBS UK
Summary of Contents for VPB
Page 1: ...Installer manual L E K VPB VPBS UK Hot water heater IHB GB 1237 7 031290 ...
Page 2: ......
Page 6: ...VPB VPBS UK Chapter 1 Important information 4 ...
Page 30: ......
Page 31: ......