Start-up and inspection
Pressure drop diagram, charge coil
Docking connection, flow line (XL8) and docking connec-
tion, return line (XL9).
VPB 200
E
Cu
0
0,05
0,1
0,15
0,2
0,25
0,3
0,35
0,4
0,45
0,5
5
0
10
15
20
25
30
40
35
45
50
Tryckfall
(kPa)
Flöde (l/s)
R
3UHVVXUH
GURS
N3D
)ORZ OV
VPB 300 / VPBS 300
0
5
10
15
20
25
30
35
40
45
50
55
0
0,05
0,1
0,15
0,2
0,25
0,3
0,35
0,4
0,45
0,5
Tryckfall
(kPa)
Cu
R
E
3UHVVXUH
GURS
N3D
)ORZ OV
Pressure drop diagram, solar coil
Connection, flow line solar heating system (XL13) and
connection, return line solar heating system (XL14).
VPBS 300
0
10
20
30
40
50
60
70
0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16 0,18 0,2
Cu
E
3UHVVXUH
GURS
N3D
)ORZ OV
19
Chapter 6 |
Commissioning and adjusting
VPB/VPBS UK
Summary of Contents for VPB
Page 1: ...Installer manual L E K VPB VPBS UK Hot water heater IHB GB 1237 7 031290 ...
Page 2: ......
Page 6: ...VPB VPBS UK Chapter 1 Important information 4 ...
Page 30: ......
Page 31: ......