
Supplied components
LEK
Current sensor
1
3 x
Room
sensor(BT50)
1 x
Outdoor temperat-
ure sensor (BT1)
1 x
LEK
Level vessel (CM2)
1 x
Temperature
sensor
3 x
O-rings
8 x
LEK
Safety valve (FL3)
0.3 MPa (3 bar)
1 x
LEK
Insulation tape
1 x
L
EK
Aluminium tape
1 x
Compression ring
couplings
6 KW
2 x (ø28 x G25)
3 x (ø22 x G20)
Filterball (QZ2)
6 KW
1 x G1
1 x G3/4
1 Not Italy and the DACH countries.
LOCATION
The kit of supplied items is placed in packaging on top of
the heat pump.
Handling panels
OPEN FRONT HATCH
Press the hatch's top left corner to open it.
REMOVE THE FRONT
1.
Remove the screw in the hole next to the on/off button
(SF1).
2. Pull the panel's top edge towards you and lift diagonally
upwards to remove it from the frame.
UN
ASSEMBLE THE FRONT
1.
Hook one bottom corner of the front onto the frame.
7
Chapter 2 | Delivery and handling
NIBE S1155PC