
Electrical connections
19
For the Installer
FIGHTER 1310 HPAC
PLEASE NOTE!
Electrical installation and service
must be carried out under the
supervision of a qualified electrician.
The electrical installation and wiring
must conform to current regulations.
The routing of cables for the power supply of FIGHT-
ER 1310 as well as the connection to HPAC should be
done on the units’ left-hand side.
Cables for external sensors must enter on the right-
hand side. Cables may leave via the top or the rear.
■
A heat pump must not be connected without the
permission of the electricity supplier and must be
connected under the supervision of a qualified
electrician.
■
If an automatic fuse unit is used this should have a
motor characteristic D (compressor operation). For
fuse size see Technical Specifications.
■
The FIGHTER 1310 does not include an isolator
switch on the incoming electrical supply. So the
installation must be preceded by a circuit-breaker.
■
If an insulation test is to be carried out in the build-
ing, disconnect the heat pump.
■
The heat pump is connected, terminal (9), to 400 V
3-phase, n earth via a distribution board
with fuses. Where there is more than one heat
pump, each unit must have a separate supply.
■
Check the direction of rotation of the heat transfer
pump (35) (clockwise as seen from the front
cover).
Cable duct for the supply.
Connecting the supply FIGHTER 1310
Electrical installation FIGHTER 1310
LEK
Svart
Vit
Grå
Brun
Röd
Röd
Grå
Grå
1
R
0
+2
-2
max
min
Cable duct for sensors.
9