Step 18: Steps Assembly
•
Once the platform is complete, it’s time to attach the steps
•
The steps might have to be cut or dug into place (depending on the slope of your surface)
•
They are secured at the top using decking screws, make sure to pre-drill the holes
•
Grab handles are then placed on the top of the steps
Summary of Contents for Everglades
Page 1: ...Everglades Swing Set Instruction Manual ...
Page 5: ...13 9ft Slide 1 14 U Nails 50 15 Rope for Cargo Net 18m ...
Page 9: ...Step 3 Cut the 3 x 1 5 flush with the 10ft posts ...
Page 12: ...Step 6 Repeat step 5 to secure the other side of the monkey bars to the other A frame ...
Page 16: ...Step 10 Screw in the support braces with decking screws and cut flush to the A frame posts ...
Page 20: ......
Page 26: ...Step 19 Slide Assembly Secure the slide using decking screws through the pre drilled holes ...