Step 5: Monkey Bar Module Assembly
•
Place the monkey bars on top of one of the A-frames.
Make sure to assembly the monkey
bars the correct way around. The monkey bars need to be secured in such a way so as the
32mm pre-drilled holes are on the top face and are closest to the A-frame with 2 x
1755mm x 3” x 1.5”
attached
•
Ensure that the monkey bar is flush with the A-frame and is overhanging either side the
same distance
•
Use the 200mm screws provided to screw the monkey bars to the 10ft posts of the A-frame,
and the 120mm screws to screw down into the 420mm post
Summary of Contents for Everglades
Page 1: ...Everglades Swing Set Instruction Manual ...
Page 5: ...13 9ft Slide 1 14 U Nails 50 15 Rope for Cargo Net 18m ...
Page 9: ...Step 3 Cut the 3 x 1 5 flush with the 10ft posts ...
Page 12: ...Step 6 Repeat step 5 to secure the other side of the monkey bars to the other A frame ...
Page 16: ...Step 10 Screw in the support braces with decking screws and cut flush to the A frame posts ...
Page 20: ......
Page 26: ...Step 19 Slide Assembly Secure the slide using decking screws through the pre drilled holes ...