Step 17: Cargo Net Assembly
•
he height and width of the squares should be approximately 300mm apart. These should
now be marked on the two posts and the 3
”
x 1.5
”.
The best way to do this is to measure the
distance between the 3”
x 1.5
” timbers and divide equally. Ensure that the gaps between the
ropes are at least 230mm to prevent head entrapments
•
Fix the horizontal rope first using the U-nails provided
•
Now using the rope, knot the vertical rope and secure using the u-nails provided
•
Ensure that the rope and the knots are pulled as tight as possible, as through time and with
wear the ropes will loosen slightly
Summary of Contents for Everglades
Page 1: ...Everglades Swing Set Instruction Manual ...
Page 5: ...13 9ft Slide 1 14 U Nails 50 15 Rope for Cargo Net 18m ...
Page 9: ...Step 3 Cut the 3 x 1 5 flush with the 10ft posts ...
Page 12: ...Step 6 Repeat step 5 to secure the other side of the monkey bars to the other A frame ...
Page 16: ...Step 10 Screw in the support braces with decking screws and cut flush to the A frame posts ...
Page 20: ......
Page 26: ...Step 19 Slide Assembly Secure the slide using decking screws through the pre drilled holes ...