Verifying Installation
26
Verifying Installation
In this chapter, you will learn how to verify that the installation of the iR1200 data
modem was successful.
This chapter includes:
Powering Up The Modem
Page 26
Communication Indicators
Page 27
LED Status Indicators
Page 28
Powering Up the Modem
Once you have completed the installation of the modem’s hardware components and
connected all the power cables, you will want to power up the modem to assure that the
installation was successful.
Powering Up – Vehicle Installation
The following table contains the steps for powering up the modem for a vehicle
installation:
1
Turn on the vehicle’s ignition.
2
The STATUS LED light will initially blink Red. This indicates that
the modem is searching for a signal within in the Nextel network.
3
A blinking Green light indicates that a signal has been found and the
modem was successful in making a connection.
4
The STATUS LED should be blinking Green within 3 minutes from
the time the vehicle’s ignition was turned ON.
Powering Up – Building Installation
To turn on the iR1200 modem, an ignition signal is required at the ignition connector.
Use the ignition sense short plug to simulate and ignition signal to power up the modem.