background image

®

 50 

 

 

 

not  touch  or  tamper  with  the 
electronics. 

 

TROUBLESHOOTING 

In addition to the tips given below, 

a thorough list of troubleshooting tips is 
at 

bbFAQ.nextadvance.com

 

start, 

make sure the Power Switch is in 

the ON (I) position. Make sure that the 

position. The plug of the power supply 
cord  might  not  be  in  a  live  wall  outlet  
or  the  power  supply  connector  might 
not  be  fully  inserted  in  the  AC  Input 
Receptacle of the Bullet Blender 50. 

If the unit stops working, 

turn the 

system  off  for  15  minutes  to  allow  the 
electronics  to  reset.  If  the  Bullet 
Blender  50  does  not  turn  on  after  this 
period, contact customer service. 

If  the  caps  on  the  50  mL  tubes 

loosen, 

make  sure  that  the  screw 

threads  between  the  lids  and  the  caps 
are  dry  when  you  close  the  caps  or 
screw  them  on,  so  that  there  is enough 
friction  for  the  caps  to  remain  tight. 
Using recommended types of tubes will 
minimize cap failure. 

For  best  results,  the  tubes  and 

sleeves  should  be  evenly  spaced  when 
placed in the Bullet Blender. 

If the 4°C light is not coming on, 

frost  from  condensation  may  be 
blocking  the  air  passage.  Remove  the 
inner  dry  ice  compartment  and  gently 
agitate  it  or  replace  the  ice.  If  mist 
coming  out  of  the  dry  ice  cooling 
container seems excessive, make sure 

that the lid of the dry ice container is 
closed securely. 

 

SUPPORT 

FAQs, protocols, and other helpful 

information are available on our 
website, 

www.nextadvance.com.

 Click 

on the Bullet Blender, then on the 
appropriate link. If you cannot find an 
answer there, please contact customer 
service by email at 
[email protected] or by 
telephone at (518) 674-3510 or (800) 
738-1681. 

 

SPECIFICATIONS 

Size: BB50-DX is 35 cm (14 in.) deep x 
38 cm (15 in.) wide x 38 cm (15 in.) 
high. 

BB5050-AU is 35 cm (14 in.) deep x 46 
cm (18 in.) wide x 38 cm (15 in.) high. 

Weight: 33lbs (15 kg) 

Power Requirement: 100-240 V, 50-60 
Hz, 2.5-4.5 A 

Capacity: 8 of 50 mL skirted (self- 
standing) polypropylene tubes. 

Relative Humidity: 5 - 90% non- 
condensing 

Operating Temperature: 4 - 40°C 

Altitude: <2000m 

Storage Temperature: -40 to 50°C 

Meets   

  requirements    (-CE 

models only) 

DOMINIQUE DUTSCHER SAS

Summary of Contents for Bullet Blender 50

Page 1: ...bsite www nextadvance com Click the SUPPORT button on the left hand menu bar and then on the appropriate link to the manual Blender will become an essential tool in your laboratory and we wish you suc...

Page 2: ...ON THE BULLET BLENDER 50 Start Operation This product complies with European Low Voltage and EMC Directives Please dispose the test tubes and the BBX or BBY Bullet Blender in accordance with local reg...

Page 3: ...e it is shown in the locked position Insert the 50 mL sample tubes in the protective sleeves and place the sleeves into the sample tube plate The threads on the sample tubes must be dry and the caps m...

Page 4: ...of various beads as well as specific protocol information please refer to our website www nextadvance com For 50 mL tubes do not operate with more than 3 5g of sample or a total of 20mL of buffer tiss...

Page 5: ...enly spaced when placed in the Bullet Blender If the 4 C light is not coming on frost from condensation may be blocking the air passage Remove the inner dry ice compartment and gently agitate it or re...

Page 6: ...r is required Next Advance may also request documentation of proper maintenance if applicable Next Advance makes no other warranty express or implied with respect to its Products NEXT ADVANCE MAKES NO...

Page 7: ...is not liable for any damages including but not limited to lost profits lost savings or other incidental or consequential damages arising from ownership or use of this product or for any delay in the...

Page 8: ...50 8 D O M I N I Q U E D U T S C H E R S A S...

Reviews: