
PPA45xx Quick User Guide
Page 65
You are now required to set the wiring configuration for the transformer.
Press “ACQU” button which will bring up the “ACQUISITION CONTROL” screen.
Press the down arrow once so the red box flashes around the wiring selection;
press the right arrow to open up the drop down menu as seen within the
screenshot below
Use the up and down arrows to
select which wiring configuration
you require. For this manual, single
phase 1 was selected to reflect the
transformer being used. Press
“ENTER” to confirm selection then
“HOME” twice to return to the power
analyzer home screen
The “Power Analyzer” home screen will now display the data measurements
collected from your transformer under test
With the transformer plugged into a Break out Box and no load attached, the
following measurements are displayed
The Voltage and Current measurements displayed within the Blue Box above
reflect the auto ranging configured by selecting the default settings within the
instruments application home set up screen