ECOLINER™ II
ALWAYS wear safety goggles or protective eye-wear when operating the unit!
1700 Jasper St., Unit F, Aurora, CO 80011
T
800.624.6706
F
303.364.7796
•
Newstripe.com
EcoLiner™ II Manual / 4620.0517
Page 4 of 11
CLEAN UP PROCEDURE
CLEAN AFTER EACH USE
1.
When your Striping job is complete, pull the paint return hose & prime valve hose out of the lid and
point them towards the ground behind the machine or in a separate pail.
2.
Remove the pail lid and set aside. Pull out suction hose and place to side of machine or in a separate
pail.
3.
Empty pail of unused paint, or remove pail completely and cover for the next time you stripe.
4.
Place another empty pail on machine.
5.
Wipe off or rinse off suction hose, screen, return hose, pump prime hose and pail lid.
6.
Remove nozzle cap, nozzle, and valve seat and put in container of water to soak.
7.
Place 2-3 gallons of clean water in the pail. Place pick up tube back in pail. Leave return hose out of
pail. This allows you to flush all hoses of paint. Start engine. Use Pump Prime valve to prime pump and
activate control lever. CAREFUL: Return hose will ‘jump’ from paint pressure. Run until spray runs
clear.
8.
Clean nozzle parts that have been soaking and reassemble on spray gun.
9.
Clean and rinse exterior of machine. Use soapy water (dish washing detergent or Simple Green) once
each week to thoroughly clean pump. Add soap to 2-3 gallons of water, run machine and let it circulate
back to pail and then empty.
CLEANING PROCEDURE FOR WINTER (FREEZING) STORAGE
1.
Clean as instructed in cleaning procedure and then place ½ bottle of pump protector in pail.
2.
Place spray knob in prime position and run pump until pump protector is seen flowing from return
hose.
3.
Turn spray knob to spray position and trigger gun until pump protector sprays from gun.
4.
Turn spray control knob to prime position, turn off pump and trigger spray gun to release pressure.
5.
Remove as much fuel from the engine gas tank as you can. Run engine until it runs out of gas.
6.
Turn Spray knob to prime position.
7.
Disconnect paint hose from pump and gun then, drain hose.
8.
Unit may now be stored in freezing temperatures.
9.
Drain and change engine oil in the spring.