Table Of Contents

Topic 

 

          Page

QUICK REFERENCE CONTENTS 

2

I) OVERVIEW 

3

II) AC POWER QUALITY AND EMI COMPATIBILITY 

3

 

B) EMI (Electro-magnetic Interference) 

3

 

C) Other Factors 

3

III) INSTALLATION 

3

 

A) Materials Provided 

4

 

 B) Mounting 

4

 

C) AC Input Wiring and Voltage Selection 

4

 

D) DC Output Wiring 

5

 

E) Parallel Wiring 

6

 

F) Chassis Grounding 

6

IV) OPERATION 

7

 

A) AC Input 

7

 

B) DC Output 

7

  Regulation
 

 

Output Voltage Adjustment

 

 

Current Limit Circuit

 

 

D.C. Fuses

 

C) Cooling Fans 

7

 

D) Remote Shutdown 

8

 

E) Local/Remote Alarm 

8

V) OPTIONS 

8

 

A) Charger Function Board 

8

 

 

Three Stage Charging

 

 

Gel/Lead Acid Selector

 

 

Temperature Compensation

 

 

Equalize Timer

  

B) DC Quick Connect Kit 

9

  

C) AC Input Transient Suppressor 

9

VI) SPECIFICATIONS 

9

VII) TROUBLESHOOTING 

10

M-PMSER-PM1245

As of January 2011

Summary of Contents for PM-12-40

Page 1: ...ther Factors 3 III INSTALLATION 3 A Materials Provided 4 B Mounting 4 C AC Input Wiring and Voltage Selection 4 D DC Output Wiring 5 E Parallel Wiring 6 F Chassis Grounding 6 IV OPERATION 7 A AC Input...

Page 2: ...FIGURE 3 Power Module Rear Panel 1 000 watt models PM 12 45 only FIGURE 1 Power Module Front Panel all models Cooling Fans Page 7 Output Voltage Adjustment Pot Pages 7 8 Output Voltage Test Points Pa...

Page 3: ...of miles from the strike point Equipment generated transient sources include utility fault conditions and load switching as well as on site equipment such as pumps and air conditioning loads motors ph...

Page 4: ...d Blue AC Neutral Green AC Ground safety earth may be Green with Yellow Stripe Input Voltage Selection As shipped from the factory the PM is set up for 230V AC input For 115V AC applications set the r...

Page 5: ...instead if the application requires it see V2 below V OUT Terminal This output is routed through an internal or ing isolation diode This terminal should be used for most installations Use of this ter...

Page 6: ...output voltage 4 Shut off the PM turn on the next unit in the system and repeat steps 2 through 4 until all PM s in the system have the identical V OUT output voltage Method 2 1 With all Power Modules...

Page 7: ...g circuit of the PM should prevent these fuses from blowing under normal operating conditions If the d c fuse s blow this may indicate a reverse polarity hook up or an internal short Always disconnect...

Page 8: ...0V DC V Options Available from the Factory A Charger Function Board Installed on Model PM 12 45 The PM can be factory modified with the installation of a charger function board If the PM has already b...

Page 9: ...out of modules for repair or replacement The kit consists of two wiring harness one for positive and negative DC output wiring another for alarm contact wiring Wires are pre cut to proper length all n...

Page 10: ...n If breaker continues to trip contact factory 2 Return to place of purchase for repair re placement or contact NEWMAR for return authorization Replace output fuse If fuse blows again return to place...

Reviews: