P a g e
|
1
NEWCO ENTERPRISES
INSTALLATION, OPERATION, AND SERVICE MANUAL FOR
KB SERIES BOTTLED WATER BREWERS
Model
Warmers
Width
Depth
Height
Weight
Watts
Amps
KB-1F
1
9 1/2"
18”
20 1/8”
34
1500
12.5
KB-2F
2
18”
9 1/2"
22 3/8”
39
1600
13.3
KB3-F
3
16 1/2"
18”
20 1/8”
43
1700
14.2
KB-TCF
0
9 1/2"
18”
20 1/8”
34
1400
11.7
KBAPF/LDF*
0
9 1/2"
18”
26 1/2"
42
1400
11.7
*We recommend up to 3 gallon bottles only due to stability, unless anchored to wall.
INSTALLATION INSTRUCTIONS
WARNING – Read and follow installation instructions before plugging or wiring in machine to electrical circuit. Warranty
FILL BREWER TANK WITH WATER BEFORE CONNECTING TO POWER SUPPLY!
1.) Place bottle on top of brewer with neck of bottle extending into receiving hole.
2.) Hold faucet open until water flows from it. Allow one minute for automatic leveling of water in tank. Plug or wire brewer to
appropriate voltage circuit as indicated on serial tag. Place decanter/carafe/airpot under brew basket and turn lower warmer
switch to the “ON” position. Depress brew start switch & check volume of water delivered into decanter/carafe/airpot. Adjust
timer to deliver desired amount of water. Turn timer dial clockwise to increase volume of water, and counter clockwise to
decrease volume.
3.) Allow 10 to 15 minutes for water in tank to heat to brewing temperature. Water has reached brewing temperature when
thermostat clicks off and heating noise stops. Green ready light will be lit on models so equipped. Empty vessels and
replace.
4.) Run one cycle to check for proper temperature setting with an accurate thermometer. Take the temperature of the water at a
point below the brew basket opening, at the start of the brew cycle, and when the vessel is half full. Recommended
temperature is approximately 195°F.
5.) In higher altitudes [5,000 feet above sea level] the thermostat may have to be adjusted to a lower temperature to prevent
boiling.
6.)
CAUTION
: On faucet models the water faucet will dispense hot water when the handle is depressed. The faucet may be
operated during brew cycle.
Man. PN: 781224
Rev. 20170309
KB-APF/LDF
KB-TCF
KB-3F
KB-2F
Vessels Not Included