
13
TANK REMOVAL & ACCESS AREAS
REMOVE (3) 8-32 NUTS TO
PREPARE TANK FOR
REMOVAL (TWO ON TOP
OF TANK & ONE ON
BOTTOM OF PUMP
BRACKET
LOOSEN SCREWS TO
REMOVE TOP & BACK
COVERS
LOOSEN BUT DO NOT
REMOVE THESE 2
SCREWS THEN LIFT &
PULL CONTROL BOARD &
BRACKET OUT OF
MACHINE TO ACCESS
TRANSFORMER
REMOVE (2) 6-32 SCREWS
TO REMOVE SIDE PANEL
FOR PUMP ACCESS
(REMOVE TOP COVER
BEFORE REMOVING
SIDE PANELS)
Summary of Contents for FKP-3
Page 2: ...2 LEFT BLANK INTENTIONALLY...
Page 18: ...18 WIRING DIAGRAM...
Page 19: ...19...
Page 20: ...20 LEFT BLANK INTENTIONALLY...
Page 21: ...21 LEFT BLANK INTENTIONALLY...