EN
www.newair.com
22
CONTINUOUS DRAINAGE
To operate the unit continuously without manually emptying the tank, follow
these steps:
1.
Remove the drain plug from the
back of the unit and retain it for
future use.
2.
Connect the drainage hose included
with the unit to the drainage port as
shown.
3.
Connect the other end of the hose
into a drain.
Please note:
•
The drain must be at or below the level of the drainage port.
•
The full water tank indicator will not work when the unit is being
continuously drained.
•
To extend the drainage hose, you can add an extension hose with an overall
diameter of approximately 0.7” (18 mm).
HEATING MODE
MODEL AC-14000H ONLY.
•
In order to properly exhaust cool air, make sure the exhaust hose and
window kit are installed correctly.
•
Set up the air conditioner for continuous drainage using the included drain
tube.
•
The working range for the heating function is 45°F to 77°F. The unit may not
provide optimal heating if used in temperatures outside this range.