2000-9
STEP 32
BD07N596-01
BD07N583-01
BD07N584-01
Remove the radiator hose (1) from the rear of the
engine, remove the heater hose from the rear of the
engine (2), remove the clamp bolts and clamps (3)
from the bell housing.
STEP 33
BD07N585-01
Tag and remove the grid heater cable.
STEP 34
BD07N586-01
Disconnect the wiring harness from the EDC 7
controller.
NOTE:
Lifting up on the lever will release the
connector from the controller.
STEP 35
BD07N591-01
Remove the fuel line from the top of the EDC 7
controller, plug the line and cap the fitting.
1
2
3
Summary of Contents for W110C
Page 1: ...Wheel Loader Tier II Print No 47476332 W110C SERVICE MANUAL...
Page 2: ...W110C Wheel Loader 47476332 Use for Repair Manual Find manuals at https best manuals com...
Page 3: ...Find manuals at https best manuals com...
Page 7: ...Find manuals at https best manuals com...
Page 9: ...Find manuals at https best manuals com...
Page 10: ...Section 1001 1001 GENERAL TORQUE SPECIFICATIONS Find manuals at https best manuals com...
Page 16: ...Section 1002 1002 FLUIDS AND LUBRICANTS...
Page 24: ...Section 1003 1003 METRIC CONVERSION CHART...
Page 25: ...1003 2 TABLE OF CONTENTS CONVERSION FACTORS 3 Metric to U S 3 U S to Metric 4...
Page 29: ......
Page 30: ...Section 2000 2000 ENGINE AND RADIATOR REMOVAL AND INSTALLATION...
Page 41: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com...