SECTION 10 -- ENGINE -- CHAPTER 1
10-25
86071893
6
1
7
3
4
9
8
5
2
5
SEPARATING THE TRACTOR AT THE
CLUTCH HOUSING/ENGINE –
8 x 2 TRANSMISSION
Disassembly
1. Disconnect the negative (--) battery cable, and
the positive (+) battery cable from the battery, 1.
2. Disconnect the headlight wiring harness, 2, and
remove the hood, 3.
3. If equipped, remove the remote loader control
valve, and all the connecting hydraulic tubes
from the right side loader tower.
4. Remove the LH and RH engine side covers, 4.
5. Remove the LH, RH and center rear hood
panels, 5.
6. Remove the steering wheel, 6.
7. Remove the instrument panel, 7, from the dash
housing. Disconnect all electrical connectors
from the instrument panel.
8. Remove the dash housing, 8, from the firewall.
Disconnect all electrical connectors from the
dash housing.
9. Disconnect electrical harness to the starter, 9.