ZigBee
TM
-Two Channes Wall Switch
Setting up the Z815B and network
To allow Z815B to function, it must first join to a ZigBee network. When it is given powered
it will automatically start searching for an existed network. So before you give power to
Z815B make sure it is within the wireless coverage distance (~70 meters or less) and
make sure
first
you have the
permit-join feature enabled
either on a coordinator or a
router device in the network so that when Z815B is powered on Z815B will automatically
join to the network.
*
On how to enable permit-join please refer to the router or coordinator device user manual
Operation:
Ensure you have detached any electrical loads from Z815B.
Step 1: Make sure you have open up permit-join function (valid for 60 seconds) of a
coordinator or a router in the network.
Step 2: Now connect AC power cable to power it. Z815B device will start to search for the
network within reach. (Notice: If the network indicator stays solid lit in the beginning, this
indicates that Z815B has previously joined to a network. If so please clear the setting
stored in the device. Refer to
Restore to factory setting
section of the manual.)
Step 3: if joining is in process, the network indicator on the Z815B will flash then turn
non-flashing. A
non-flashing solid light
indicates successful otherwise the indicator
stays dark. If unsuccessful remove power from the device and repeat the whole procedure
again. Make sure that the permit-join of a router or coordinator is enabled first.
Setting Up Summary
(1) Startup and network association
(2) Device paring where applicable (i.e. pair with a ZigBee switch for wireless control).
(3) Target device pairing to a collector device for consumption reporting
(4) It is ready to be used.
S
tep 1.
Startup and Network Association