FERTIKIT 3G
INSTALLATION MANUAL
37
SYSTEM OPERATION
NOTE
The following procedure describes the operations that should be performed, regardless of the type
of controller in use. For the operation of the specific controller interface, see the
Controller Manual
.
ATTENTION
Make sure all the wire connectors and terminals are tightened before switching on power!
Preparations for running the FertiKit
™
For FertiKit™ with a controller (onboard or external):
Run the controller and enter preliminary general settings (see the
Controller Manual
).
Ensure that the INPUT for protection against lack of pressure in the system is connected to the controller
and defined, set a delay of 15 seconds (see the
Controller Manual
).
Connect all the elements (valves, pumps, filters, sensors, etc.) to the controller (see the
Controller Manual
).
Manual test of controller outputs
Perform the test to make sure that all the elements (valves, pumps, filters, sensors, etc.) function properly
upon command from the controller.
Run the test using the controller's TEST menu (see the
Controller Manual
).
Set the relay status of the dosing channels to MANUAL
and make sure that the irrigation program is not defined (see the
Controller Manual
).
NOTE
When using a dosing valve with manual override (model: Fip S12 or S22),
make sure the dosing valve selector is in the CLOSED position.
To check that the dosing channels are working:
When the OPEN command from the controller is given -
the LED on the dosing valve is lit.
Calibration of EC and pH sensors
Calibrate the EC and pH sensors (see the enclosedEC/pH Transmitter Manual).
CAUTION
Do not operate the FertiKit™ if the manual isolation valves installed
at the inlet and outlet of the system are closed!
ATTENTION
Unions tend to get loose during transit.
Before operating the FertiKit™, tighten all the unions of the FertiKit™ by hand.
Check for leaks
CAUTION
When opening or closing any manual valve, always do it gradually, to prevent damage to the
system by water hammer.
OPEN
CLOSE