FERTIKIT 3G
INSTALLATION MANUAL
21
DESCRIPTION
Typical setup of the ST mode
FertiKit
TM
3G
13
14
15
17
18
19
16
Main parts of the ST mode and infrastructure
The list below presents the main parts of the FertiKit™ ST mode and the infrastructure parts required for
its operation as depicted in the Schematic diagram and the Typical setup drawing above.
Color code:
Supplied (part of the FertiKit™), Not supplied (part of infrastructure).
1
Dosing c Venturi
2
Upper manifold pressure gauge
3
Lower manifold presure gauge
4
Sampling outlet
5
Controller
6
EC sensor
7
pH sensor
8
EC/pH transmitter
9
Dosing booster
10
Dosing booster switchbox
11
Check valve
12
Pressure switch
13
Fertilizer/acid stock tank
14
Manual valve (fertilizer)
15
Fertilizer/acid filter
18
Irrigation valve
20
Main line filter
21
Main line pump
27
Pressure reducing valve (PRV)
28
Water meter
29
Air release valve
20