5.1 PV (Performance Verification) test
5-2
5.1.2 Procedure
Before starting the PV test, check the following.
1) Log in to the system ?
2) The message below left of Current Status is “IDLE” ?
3) C/N is “OK” ?
Procedure
1. Press [F7/Option], [7] and then [1] to show PV Test start display.
Fig.5.1.1 PV Test start Yes/No display
2. Select “Yes” and then press [Enter].
Fig.5.1.2 PV Test start display
3. PV test is started. To check the PV test progress, see Current Status or the message
in the display.
1) When NCS replays, “PENDING” appears on Current Status.
2) When the test is automatically started, “TESTING” appears on Current
Status.
3) The message for the test is sent from LES to MES.
4) The message for the test is sent from MES to LES.
5) The distress alert test is started automatically two minutes later.
6) The PV test result information is sent from LES to MES.
4. After finishing the test, “IDLE” appears on Current Status.
5. Check the PV test result.
Summary of Contents for Inmarsat-c
Page 1: ...INMARSAT C MOBILE EARTH STATION Nera C Service Manual...
Page 2: ......
Page 28: ...2 3 Terminal unit IC 215 2 8 Fig 2 3 3 Block diagram of RF CON CPU board...
Page 190: ...AP4 10 E Mail Client Setup AP4 28 15 Click OK Set to 5 minutes...
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......