Initial Verification 

 

Initial verification and start-up (commissioning) must be carried out by suitable 
qualified personnel. 

Clearance 

1.  Ensure  that  cabinet  of  the  humidifier  is  installed  in  a  location  where  the 

humidifier can be serviced correctly. 

 

 

 

 

Electrical 

2.  Check that the power supply (voltage) conforms to the appliance name plate 

on the humidifier side. 

 

3.  Confirm  that  24Vac  is  present  between  tab  1&2  of  the  control  terminal, 

located on the control connection PCB.  Remove the  front top cover to get to 
this PCB. 

 

 

 

 

Water 

4.  Ensure that water is supplied to the humidifier. A shut-off and a non-return 

valve must be outside the humidifier.  
Once the water shut-off valve is turned ON, ensure that there are no apparent 
leaks.  

 

5.  Confirm that drain piping is properly connected with a pitch of at least 6.5mm 

per 300mm horizontal run. 

 

 

 

 

Steam 

6.  Check that steam distributors are properly installed into the ventilation duct. 

 

7.  Verify  that the flexible steam hoses and rigid steam supply  pipes are shorter 

in  total  length  than  5  meters,  properly  sloped  and  have  condensation 
P traps wherever required. 

 

 

 

 

Gas 

8.  Verify that a proper regulator and gas test point have been installed on the 

gas line to the humidifier. 

 

9.  Confirm that gas is supplied to the humidifier and that the shut-off valve 

located outside the humidifier is closed. 
Once the shut-off valve is turned ON, check for leaks, gas, smell or hissing 
sound. 

 

 

 

 

Flue Gases 

Venting 

10.  Verify the flue gases venting as follow: 

 

a)  A tee is installed with a drain trap for the flue gases condensate. 

 

b)  Check that all connections are air tight. 

 

c)  The total length of the vent equivalent is not longer than 30 meters. 

 

d)  An approved venting system is used. 

 

Note: 

Aluminum B vent is not acceptable. 

 

Controls 

11.  Ensure that a high limit duct humidistat is installed, properly connected to the 

humidifier and that the setpoint is properly adjusted. 

 

12.  Verify that a room humidistat or return air duct humidistat is installed, properly 

connected to the humidifier and that the setpoint is properly adjusted 

 

13.  Turn  the  power  ON  at  the  disconnect  switch.  The  LCD  screen  located  on 

control  panel  must  display  the  model  number  and  serial  number  of  the 
humidifier

, along with the message “Unit is off’’. 

 

14.  Confirm  the  control  set-up  of  the  humidifier  (display  #200).  The  humidifier  is 

factory  set  with  EXTERNAL  control  set-up,  which  means  that  the  humidity 
demand is controlled by the room or duct humidistat. 

 

15.  Ensure that the type of signal (0-10Vdc, 2-10Vdc or 4-20mA) of the humidistat 

corresponds  to  the  type  set  in  the  humidifier  control  set-up  menu  (display  # 
201). 

 

!