
www.neptronic.com
Direct Steam Injection Humidifier
Installation Instructions and User Manual
Page | 6
Handling and Packing
Handling and Lifting
Lifting or handling MUST be carried out by trained and qualified personnel. Ensure
that the lifting operation has been properly planned, assessed for risk and that the
equipment has been checked by a competent Health & Safety representative, and
effective control measures are in place.
It is the customer’s responsibility to ensure that the operators are trained in handling
heavy goods and to enforce the relevant lifting regulations.
The
Direct Steam Injection Humidifier MUST always be handled and lifted with care
and should remain in its original packaging for as long as possible prior to installation.
The
Direct Steam Injection Humidifier
package may be carried using a forklift from the
underside. Caution should be exercised to ensure balanced load before lifting.
Unpacking
The Direct Steam Injection Humidifier is shipped inside carton boxes or in a wooden crate. Remove
packing and skids prior to commissioning.