12
Installation
This extractor hood
is intended to be
mounted onto the kitchen wall.
1.
Remove the grease filter (refer to
Operating Instructions).
2.
Draw a line on the wall from the ceiling
to the lower edge of the hood at the
centre of the location where the hood is
going to be mounted.
3.
Using the template, mark positions on
the wall for the screws.
Ensure that the minimum distance bet-
ween the hob and the extractor hood is
maintained –
550 mm
for an electric hob
and
650 mm
for a gas hob. The bottom
edge of the template equates to the lower
edge of the extractor hood.
4.
Drill 4 x
l
8 mm holes for the extractor
hood and 2 x
l
8 mm holes for the
chimney panelling. Insert plugs into the
holes so that they are flush with the wall.
Note:
Take into account any special
accessories that are going to be fitted.
5.
Attach the 2 enclosed spacers to the
fixing bracket for the flue duct panelling.
Attach the fixing bracket for the
chimney panelling using two hexagon
head cap screws.
6.
Screw in the two upper hexagon head
cap screws leaving them extended by
approx. 5 mm.
7.
Attach the extractor hood to the
screws.
ca.5mm
30
178
347
36,5
400
mind.550 Elektro
mind.650 Gas
216
334