Theodolite ET-5
Operating Instructions
20
4 Preparation for Measurement
EN
4.3
Initialising the vertical circle
Following the alignment in accordance with the
procedure described above, the vertical circle of
the theodolite must be initialised (observe
information shown in the display).
To initialise the telescope, turn the telescope
slowly in both directions until the message ("SET
0") disappears and the angle display for the
vertical measurement is shown.
The unit is now ready for operation.
After switching on the instrument and initialising
the vertical circle, a display similar to the
illustration on the left appears.
Top line:
Display of the vertical angle
V:
V
ertical measurement
Bottom line:
Display of the horizontal angle
H:
H
orizontal measurement
4.4
Setting/Changing the date and time display
1.) At the switched off unit, simultaneously press the two keys and ,
and then press the key. Release the key when all the segments are visible in
the display. After
ADJ2
has appeared in the display, release + also.
The year now flashes in the display.
2.) Press the key to switch between: year – month – day – hour – minute.
3.) Press the key to increase the value and press the key to reduce the value.
4.) To save the settings, press .
Summary of Contents for 460 812-613
Page 63: ...ET 5 63 1 RU 1 1 ET 5 ET 5 1 2 ET 5 Nedo ET 5 ET 5 1 3...
Page 64: ...ET 5 64 2 RU 1 2 ET 5 3 4 5 6 7 8 2 3 1 2 3 4 5 6 7 8...
Page 66: ...ET 5 66 4 4 RU 4 1 1 2 3 4 4 ET 5 4 AA LR6 1 unlock 2 1 1 2 3 2...
Page 67: ...ET 5 67 4 RU 4 2 1 2 3 2 3 4 A B 5 90 0 0 00 00 90 4 5 180 460812 613 460814 613 ON OFF OSet...
Page 68: ...ET 5 68 4 RU 4 3 SET 0 V H 4 4 1 ADJ2 2 3 4...
Page 70: ...ET 5 70 5 RU 5 2 2 HR HL 5 2 3 HRL R L R L HOLD HOLD...
Page 74: ......