Page
of
35
55
Manual FLR-line
Example of goods receiving role
Installing cabling and filters
During the preparation phase, the exact cabling required was already determined. Now these cables can be
placed.
All wiring should be done according to local regulations.
When cables are put in the slit or conduit, it is recommended to mark them with IN and OUT, or PREVIOUS and
NEXT, as this will allow you to distinguish them from each other.
Filters
Please note that filters should be placed around the cables to reduce interference with other systems. These
filters are delivered together with the system.
Filter should be placed at:
Every Power Inserter: around the Ethernet cable, both at the OUT and IN port.
Every Renos unit: around the Ethernet cable and the RFID coaxial cable (when used), both at the OUT
and IN port.
Every 9 m (30 ft.) for longer Ethernet cables.
Summary of Contents for !D Gate
Page 1: ...PRELIMINARY i30 i45 D Gate D Hybrid Gate Firmware version 14 35 and newer Manual FLR line ...
Page 11: ...Page of 11 55 Manual FLR line FL30R ...
Page 12: ...Page of 12 55 Manual FLR line FL45R ...
Page 32: ...Page of 32 55 Manual FLR line Example of EAS role ...
Page 33: ...Page of 33 55 Manual FLR line Example of EAS role with toilet ...