background image

© by N&W GLOBAL VENDING S.p.A. 

52

 

10 2009  3325 - 00

c.p.u. 

Board

The C.P.U. (Central Process Unit) board can manage 

all the users arranged for the maximum configuration 

as well as the signals coming from the keyboard and 

the payment system. It can also manage the actuation 

board.

 -The LEDs can supply the following information during 

the operation:

 -

The green LED (26) is flashing on and off during the 

normal operation of the C.P.U. board;

 -

The yellow LED (28) will turn on when 5 Vdc is applied;

- The red LED (27) will turn on if the software is reset for 

any reason whatsoever.

Fig  39

1-  Door micro (optional)

2-  Validators

3-  Battery jumper (2-3)

4-  To the button/LED board

5-  Not used

6-  JP4 WDI jumper (closed)

7-  Up-key

8-  Numeric selection keyboard (optional)

9-  Programming button

10- Graphical display

11- not used

12- RS232 serial port

13- EXE/BDV payments

14- MDB payments

15- Can-Bus

16- Can-Bus

17- JP1 Can-Bus jumper (closed)

18- Buzzer

19- Not used

20- Not used

21- Not used

22- RAM data expansion (optional)

23- 34Vdc power supply

24- Door lighting connection

25- Lighted path and mechanical counter

26- Green led DL3 “RUN”

27- Red led DL2 “RESET”

28- Yellow led DL1 “+5V”

29- To the external programming and washing button

30- Battery

31- Not used

Fig. 38

1-  RS232 serial port

2-  Display board 

3-  “Statistics” button 

4-  “Washing” button

5-  C.P.U. board 

6-  “Cup catcher” button

7-  “Programming” button

8-  “Ingredient priming” button

9-  Coin chute

10- Coin return lever

Summary of Contents for Canto Plus Espresso

Page 1: ...INSTALLATION OPERATION MAINTENANCE EN English DOC NO H 3325EN 01 EDITION 2 10 2009 Canto Plus Espresso...

Page 2: ......

Page 3: ...s sp cifications techniques d signations qui ont t appliqu es conform ment aux r gles de la bonne pratique en mati re de s curit en vigueur dans l UE sont Deutsch Die harmonisierten Standards oder tec...

Page 4: ...by children and by people having reduced physical sensorial or mental skills under the supervision of people responsible for their safety or specifically trained on the use of the machine Children sh...

Page 5: ......

Page 6: ......

Page 7: ...ical connection 14 Filling the water circuit 15 Sanitising mixers and food circuits for the first time15 Operation 16 Compartment cover 16 Cup sensor 16 Stirrer sugar dispenser 17 Espresso unit 17 Aut...

Page 8: ...specific serial number that can be found on the rating plate arranged inside on the right side The plate see figure is the only one recognised by the manufacturer and it contains all the data that en...

Page 9: ...of 24 Vdc validators The space is not only arranged to accommodate the coin mechanism but also to assemble the most wide spread payment systems optionals Sales prices You can set up a programmable dif...

Page 10: ...protection with fuse main electric circuit board and coin mechanism supply transformer primary and secondary Container capacity beaned coffee Kg 4 2 stirrers if any N about 950 Containers having a 2...

Page 11: ...on lock The lock is complete with a silver key for normal opening and closing operations It is possible to customise the locks by using a kit made available as an accessory and intended to change the...

Page 12: ...that may have built up during storage It is recommended to use sanitising products also in order to clean the surfaces not directly in contact with foodstuffs Some parts of the machine can be damaged...

Page 13: ...lled To load the column act as follows Open the machine door Pull the shelf to release the dispensing compartment Turn the shelf to the outside Remove the cover from the cup stacker Load the cups stac...

Page 14: ...the cover and fill in the coffee container Make sure that the shutter is completely open see fig 8 Stirrers To load the double stirrer stacker correctly act as follows remove the external and internal...

Page 15: ...e sure that all visible residuals and films are me chanically removed Use pigs and scrapers if neces sary Sanitise by making use of sanitising products dip the components into a container with the san...

Page 16: ...tely necessary to reassemble the cover before setting the machine at work see figure 12 Sugar release It is recommended to clean the sugar dispenser by using hot water at regular intervals on the mode...

Page 17: ...a brush to clean the fun nel area and the container support surface by removing any powder residue at regular intervals Surfaces can be cleaned by using a wet piece of cloth Service interruption If t...

Page 18: ...s open you are not allowed to access any live part Only the parts protected by covers and marked by the plate power off before removing the cover will remain live inside the machine Before removing th...

Page 19: ...pport the network pressure and of a type suitable for foodstuffs min inner diameter 6 mm see fig 18 It is recommended to apply a cock on the water net work outside the machine in an accessible positio...

Page 20: ...by using only cables of the HO5 RN F or HO5 V V F or H07 RN F type 3x1 1 5 mm2 in cross section It is forbidden to use adapters multiple sockets and or extensions THE MANUFACTURER WILL DISCLAIM ALL R...

Page 21: ...l function of the test menu in the Technician mode if the optional water supply kit from internal tank is mounted or as a result of any maintenance operation requiring the operator to empty the boiler...

Page 22: ...ularly falling into the shift arm To mount the device just extract the conveying ring secured by means of a screw and mount the device onto the ring just as it is shown by fig 20 CUP SENSOR Some model...

Page 23: ...the normal cycle to make sure that the device will occupy the initial position Coffee dispensing cycle Whenever you require a coffee based selection the grinder will operate to fill the coffee doser c...

Page 24: ...ol and regulation To achieve the best results compared with the product in use it is recommended to check The used coffee dose shall be slightly compressed and moistened The granulometry of the ground...

Page 25: ...grinding time and brewing time properly the machine will assume a selection as a reference for the operation of automatic devices The device will make sure that the brewing time pro grammable via soft...

Page 26: ...antity to be dispensed expressed in volu metric counter pulses cdv is established according to the type of selection After having set the water value on the reference selection the machine will requir...

Page 27: ...dure The pump is operated at two different speed rates for a well defined time interval Store the water quantities you have achieved Customising drinks If you customise drinks by considerably changing...

Page 28: ...checks are performed Operations that can be performed when the door is closed The selection is dispensed and messages are dis played for the user Filler menu Statistical findings and execution of simp...

Page 29: ...ting on the door switch and by pressing the programming button POWER ON Whenever you power on the machine the display will show the software release number CANTO software rev x x machine board rev x x...

Page 30: ...U Press the programming button on the machine door once to set the machine to the filler menu mode The first item of the filler menu appears on the display with a series of available operations The la...

Page 31: ...e tubes manually If you confirm load Credit will appear on the display This is the value of the money made available in the tubes for the change If you insert a coin into the validator the display wil...

Page 32: ...ilable and manage the relative func tions PAYMENT SYSTEMS Type of coin mechanism Validator TECHNICIAN X The communication protocols for the payment systems available are listed here below Validator Ex...

Page 33: ...ful delivery but the credit will remain available for further dispensing If you press the coin return button the remaining credit will be returned if its value is lower than the maximum change value C...

Page 34: ...change The amount relative to a selection is generally cashed after the machine has sent the Successful selection signal If you enable this function which is disabled by default the cash signal is se...

Page 35: ...tem 2 forced sending to cashless 2 cash transactions are recorded as transactions performed by the second cashless system Parallel machine Function used to enable the presence of a validator or parall...

Page 36: ...me band you can manage not only the standard price list but also three further price lists according to the type of cashless support in use key 1 3 If you use a time band selections will be dispensed...

Page 37: ...elay in hundredths of a sec ond with respect to the pump start event start Dose in CC You can directly set up the water quantity you wish for every single event start in cc Dose in CDV for espresso dr...

Page 38: ...ion is performed at the factory but you may have to repeat it for various reasons After having found out the mixer where to act and con firmed the type of nozzles in use the pump is operated for a wel...

Page 39: ...itialisation function you can initialise the machine by restoring all default data Press the Enter key to display the request for con firmation Do you confirm If you press the Enter key once again you...

Page 40: ...Technician Menu as soon as you access the programming mode The request for password is disabled by default Espresso Unit Pre grinding Use this function to enable or disable the grinding cycle of a co...

Page 41: ...uipped with a cup sensor composed by a photocell detecting the presence of an object in the dispensing compartment If the function is enabled and an object is detected in the dispensing compartment th...

Page 42: ...machine is arranged for bank connection with other automatic vending machines Samba Samba Top and Diesis Setup Use this function to set up the hierarchies of the master slave1 slave2 relations betwee...

Page 43: ...irator management Use this function to set the continuous operation of the suction fan wheel of instant products ON fan wheel always on OFF fan wheel on only during the dispensing cycle and for the ne...

Page 44: ...coffee and dispense some selections of reference grinding will automatically become stable Autotest Function used to check the operation of the main com ponents of the machine semiautomatically Press...

Page 45: ...terminal Set to 0000 by default End of transmission if enabled it can recognise the end of transmission signal sent to the latest package and interrupt data transmission dex ucs no parameter can be co...

Page 46: ...vailable in the change tubes Aud 2 Money to the tubes Money conveyed to the change tubes Aud 3 Money to the coin box Money conveyed to the coin box Aud 4 Change returned Total amount of the money that...

Page 47: ...le with all the statistical data currently available on the vending machine Please specify the name you wish to assign to the file e g CANTO000 STA delete Use this function to delete one or more than...

Page 48: ...as never signalled any lack of water No cups As soon as the no cups microswitch is opened the cup stake shift motor is actuated The machine is put out of order if the microswitch has not closed after...

Page 49: ...ed the No cup message will appear on the display after having failed to dispense a cup for three times Use the correspond ing function to define whether the failure shall lock the machine or let it re...

Page 50: ...valve is operated for over 20 If a water failure is available you can manually restore the service by pressing a key of the pushbutton panel The water inlet solenoid valve is supplied for max 20 if t...

Page 51: ...aintenance operations The most complex operations e g boiler descaling must be carried out by a technician having a specific knowledge of the vending machine In order to avoid any risk of oxidation or...

Page 52: ...all their parts remove all visible residues and films mechanically by using pigs and scrapers if necessary the components shall be immersed into a sanitising solution for at least 20 minutes the inte...

Page 53: ...s follows any way access the Filler mode to wash the mixer see the relative paragraph and add some drops of the sanitis ing solution into the various funnels after having sanitised rinse the parts abu...

Page 54: ...the toothwheel microswitch activator gear with the scroll support arrow observe the orientation of scrolls as it is represented by the figure PRODUCT CONTAINERS Remove the containers from the machine...

Page 55: ...to the cover by means of a bayonet connection To disassemble them Detach the connector Turn the pump for forcing slightly to overcome the snap lock The direction of rotation is alternatively clockwise...

Page 56: ...er on the machine if the grinding time should exceed the grinding time stored when grinding wheels were new by over 50 After having replaced the grinding wheels and reassem bled the grinding wheel rin...

Page 57: ...ing After having loaded the software use the new board to define which type of keyboard to use before initialising or programming the various parameters To access the pre programming function keyboard...

Page 58: ...ors 3 Battery jumper 2 3 4 To the button LED board 5 Not used 6 JP4 WDI jumper closed 7 Up key 8 Numeric selection keyboard optional 9 Programming button 10 Graphical display 11 not used 12 RS232 seri...

Page 59: ...8 29 shows the volumetric counter pulses if mounted the green LED 5 5 is signalling that 34 Vdc is applied the green LED 7 24 is signalling that 34 Vdc is regu lated and applied Instant boiler control...

Page 60: ...resso shelf Current regulator board The current regulator board will supply lighting LEDs by means of direct current The board will provide for the constant brightness of aesthetic panels The board is...

Page 61: ...umetric counter 5 Espresso solenoid valve 6 Coffee boiler 7 Espresso unit 8 Espresso tray 9 Small nozzle plate 10 Mixers 11 Dispensing nozzles 12 Safety thermostat 13 Anti boil thermostat 14 Rotation...

Page 62: ...able status and the numeric value of the functions Confirmation enter key Press the confirmation Enter key to move to the lower level or to confirm a data item you have just en tered or modified Exit...

Page 63: ...by N W GLOBAL VENDING S p A 57 01 2013 3325 01 APPENDIX WIRING DIAGRAMS...

Page 64: ...J6 15 J18 2 N 230V J6 11 80 2 8 1 14 6 7 J2 3 SM2 J2 2 SM2 R1 M1 P1 P2 R2 M2 PTC PTC 1 2 J2 SM1 3 4 J1 SM1 7 6 5 4 3 2 1 2 3 4 5 6 1 SCIROPPI 24Vdc 7 0 8 2 L 2 U 1 N 4 U 3 4 5 1 2 3 4 1 4 7 10 13 2 5...

Page 65: ...PF J6 15 3 4 6 0 J6 10 96 Mvuoto 5 7 8 J8 SM1 8 6 1 PS1 7 3 PS2 1 9 7 3 7 45 KS VAR PM PM KS VAR SCIROPPI 10 80 60 0 9 92 SM2 1 J1 93 2 J2 2 J2 3 97 3 J2 4 87 6 J2 5 70 1 6 7 9 1 8 45 N 230V F 230V J2...

Page 66: ...2 2 1 9 4 2 5 3 3 0 0 4 1 ICM 45 6 3 ESC2 45 ESC 87 1 9 ID MFB 6 3 4 8 91 0 J6 1 J6 16 IVA 12 11 0 1 14 90 70 92 80 96 7 82 70 8 6 8 MF FB 5 7 VENT 1 2 6 2 8 9 1 5 1 2 2 0 7 2 0 3 90 6 8 7 26 96 90 3...

Page 67: ...45 45 F 230V N 230V RCC KC1 KC2 3 2 7 45 45 J14 2 6 J15 2 96 90 PM MAC KS1 45 70 8 J14 3 MAC2 9 1 J14 5 87 ESC 45 ESC2 5 J14 4 60 45 4 J14 6 30 45 ER MMA1 2 1 4 J19 6 MMA2 3 J19 5 5 J19 1 7 5 60 9 45...

Page 68: ...MDB MDB COIN MECH CONNECTOR MP OPEN DOOR SIGNALLING MICRO PIP PROGRAMMING BUTTON SX 6085 487 01 This drawing contains confidential informa tion and is the property of the holding company of N W or on...

Page 69: ...ERIAL PORT SALIM POWER SUPPLY UNIT BOARD SLED LED BOARD SUC C P U BOARD PL WASHING BUTTON PPO PRIMING BUTTON PST STATISTICS BUTTON PTB CUPS SHIFTER BUTTON SCHEMA ELETTRICO WIRING DIAGRAM Porta Door Ca...

Page 70: ...________________ ________________________________________________ ________________________________________________ ________________________________________________ ____________________________________...

Page 71: ...ll responsibility for any inaccuracy contained in this publication that can be ascribed to printing and or transcription errors All instructions drawings tables and information in general contained in...

Page 72: ......

Reviews: