![Neco STIR-RITE Owner'S/Operator'S Manual Download Page 29](http://html1.mh-extra.com/html/neco/stir-rite/stir-rite_owners-operators-manual_3808455029.webp)
29
Figure 25. USA, Three Phase, 230 volt Junction Box
Units with Metal Junction Box (USA),
3-Phase, 230 volt
NOTE:
Wiring must be installed by a qualified
electrician.
Adjust the service cord(s) so that the cord
reaches the appropriate motors when the trol-
leys are in the outermost position that they’ll
travel to. Allow for some droop in the cord(s), as
shown in Figures 4 and 23. Insert the cord(s)
into the junction box, as shown, leaving at least
12” slack outside the box. The cord(s) may be
cut to allow about 7” of wire length inside the
junction box.
Thread the cord from the drive cluster through
the bottom connector, as shown in Figure 25.
The cord may be shortened after allowing some
slack outside the box.
Insert the rotating contactor cord from the left,
as shown and wire according to Figure 25.
Boxes are shown with the cover removed for
illustration purposes only.
Do not operate your
Stir-Rite system with the cover removed!
Do
not remove the cover while power is being sup-
plied to stirring machine.
Black = 2
White = 3
Red = 4
Summary of Contents for STIR-RITE
Page 23: ...23 Figure 18 Main Trolley Assembly Main Trolley Motor Mount 3 2 Motor Pulley Beam...
Page 24: ...24 Cord Connections to Motors Figure 19 Cord Connections to Single or Multiple Down Augers...
Page 45: ...45 APPENDIX...
Page 46: ...46 Stir Rite System General Overview...
Page 48: ...48 This page is intentionally left blank...
Page 49: ...49 REPLACEMENT PARTS...
Page 52: ...52 Stir Rite System Pivot Assembly...
Page 54: ...54 Stir Rite System Main Trolley...