NEC XN120 Vision Getting Started Download Page 10

Battery Box Operation 

 

10 

 

 

 

                   XN120 Battery Box Guide 

6- Configure the XN120 

There is no configuration related to the battery box. 
 
 

7- Test the Power Fail Operation 

You should test each battery box/XN120 main and expansion unit separately. 
 

With the XN120 unit switched 
ON, powered by mains power 
and also connected to the 
battery box. 

 

 

 

 

Turn OFF the mains power to 
the XN120 unit 

The XN120 unit should continue to operate as normal. 
Leave the power OFF for 30 seconds to ensure the system continues 
to operate correctly. 
Check that you can make/receive a call from any of the telephones to 
confirm the system is working correctly. 

 

 

 

Turn ON the mains power to 
the XN120 unit 

The XN120 unit should continue to operate as normal. 

 

P

 Ensure the mains power is ON to all XN120 units after you complete the tests. 

 
 

System Operation when Battery Box is connected 

· 

The battery box will provide battery back up when the mains power fails to the XN120 unit. 

· 

The XN120 charges the batteries whilst it is mains powered. 

· 

Each XN120 main/expansion unit must have a separate battery box connected.  

 
When the mains power fails the XN120 unit will continue to operate as normal until the batteries become 
discharged. The XN120 unit is considered to be in 

battery back up mode

 at this time, it is not in power fail 

mode. 
When the batteries are discharged the XN120 unit will stop working, the XN120 is now considered to be in 

power fail mode

 

!

 If you switch off the XN120 unit whilst in battery back up mode it will not power back on until the mains power 

is supplied. The XN120 will not start up in battery back up mode. 
 

Power Fail Telephones 

If the XN120 has power fail telephones connected (refer to the XN120 Getting Started Guide 991409-5 for 
details of connecting power fails telephones and power fail options) they will become active when both the 
mains power fails and the batteries are discharged i.e. when the XN120 is in power fail mode. 
 
 

Battery Maintenance and Replacement. 

The batteries should be replaced every 3 years to ensure the maximum battery back up duration (1 hour) is 
available.  
The maximum operating life of the batteries is 5 years, the battery back up duration will begin to reduce after 3 
years. 
The label on the front cover of the battery box should indicate the battery installation and replacement dates. 
Follow the instructions in this guide when replacing the batteries. 
Follow the instructions supplied by the battery manufacturer for disposal of the old batteries. 
 

Replacing the fuse 

Replace with the same type of fuse – 20mm 4Amp fast acting. 

Summary of Contents for XN120 Vision

Page 1: ...ation supplied for future reference Regulatory Notice Refer to the Getting Started Guide 991409 5 supplied with the XN120 Main Unit for the Declaration of Conformity related to the product Warning Thi...

Page 2: ...the Battery Box 5 2 Wall Floor Mount the Battery Box 6 3 Install the batteries 7 4 Connect the Battery Box to the XN120 8 5 Connect the Power System Start Up 9 6 Configure the XN120 10 7 Test the Powe...

Page 3: ...uasa 2 6Ah 12V Battery Specification Battery capacity 12V 2 6Ah or equivalent Voltage must be 12V Battery Only the manufacturer and type of battery specified must be used Yuasa NP2 6 12 134x67x64 mm 1...

Page 4: ...XN120 Battery Box 4 XN120 Battery Box Guide Connection Diagram Batteries 280 mm 155 mm XN120 Main or Expansion Unit Battery Cable XN120 Battery Box Battery box connecting cable 2 5 metres...

Page 5: ...of connecting cable attached 3 screws for securing the box to the wall Battery retaining bar with 2 fixing brackets 2 wing nuts for the battery retaining bar 2 Orange cables 1 required when used for...

Page 6: ...unit the connecting cable is 2 5 metres long 2 Loosen the 4 screws on the front of the battery box and remove the front cover 3a Floor Shelf mounting Position the battery box on the floor shelf Secur...

Page 7: ...e of the orange cables connect the ve terminal of one of the batteries to the ve terminal of the OTHER battery CAUTION DO NOT SHORT CIRCUIT the battery terminals 4 Connect the batteries to the socket...

Page 8: ...are installed 2 Remove the sub cover of the XN120 Unit 2 Connect the cable from the battery box to the socket in the XN120 unit The plug on the battery box connecting cable is polarity sensitive ensu...

Page 9: ...on the system check that the NORMAL switch is set to ON This will ensure that the system memory retains your configuration The NORMAL switch is located to the right of the MOH Page connector on the m...

Page 10: ...s become discharged The XN120 unit is considered to be in battery back up mode at this time it is not in power fail mode When the batteries are discharged the XN120 unit will stop working the XN120 is...

Page 11: ...teries are of a sealed valve regulated type gases may be released from the batteries Do not install the battery box in a sealed enclosure Never short circuit the battery terminals There is a risk of e...

Reviews: