System Maintenance Manual
2 - 1
Chapter
2
System Maintenance
S
ECTION
1
I
NTRODUCTION
The technician can use this book to troubleshoot and diagnose problems
during and after system installation. The troubleshooting flow charts and
general test procedures help the technician identify possible causes of the
problem by defining the problem area.
Using the System Data Upload/Download feature, all System
Programming and Speed Dial data can be stored on disk for safe keeping.
After all System Programming is completed, it should be downloaded to a
disk for backup. When system memory fails, this data on the disk can be
uploaded and the memory restored.
S
ECTION
2
O
PERATIONAL
T
EST
P
ROCEDURES
2.1
General Information
When an UNIVERGE SV8100 system is first powered up, an
initialization is performed. During this process the CD-CP00-US
(CPU), located in the first chassis, scans each interface slot to
determine the hardware configuration used. This information is
stored in the resident system program memory with the system
default values. This section provides test procedures that are used
before, during, and after the initialization process.
2.2
Before Initializing
The technician must follow these steps before initializing the
system.
2.2.1
Cable Connections
All wiring for power supplies or flat cable connectors
should be checked for solid connections.
Summary of Contents for Univerge SV8100
Page 2: ......
Page 3: ...System Maintenance Manual INT 2057 UNIV ISSUE 1 0...
Page 4: ......
Page 6: ......
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 0 UNIVERGE SV8100 2 22 System Maintenance NOTES...
Page 76: ...Issue 1 0 UNIVERGE SV8100 3 36 NOTES...
Page 77: ......
Page 78: ...System Maintenance Manual NEC Unified Solutions Inc Issue 1 0...