3. Connect the other end of the cable to your TCP/IP network.
When the base station powers on, the STATUS LED on the front briefly lights orange and then
turns off while it initializes and connects to the network. After the base station successfully initial-
izes and connects to the network, the LED lights green and remains steady on.
Table 2-27 Base Station LEDs States and Meanings on this page
provides a list of base station
LEDs and their meanings.
Table 2-27 Base Station LEDs States and Meanings
Color
State
Meaning
Green
Flickering
Stage in base flash memory rewrite at the end of the base firmware update.
Green
Steady on
All operations normal.
N/A
Off
No power in unit
OR
initializing and connecting to the network.
Orange
Briefly on
Powering on.
Orange
Flickering
Stage in base flash memory rewrite at the end of the base firmware update.
Red
Blinking
Factory reset warning. A factory reset has been initiated or is in progress.
Red
Blinking
No Ethernet connection available
OR
handset registration failed.
Red
Flickering
Stage in base flash memory rewrite at the end of the base firmware update.
Red
Steady on
Critical error. Contact technical support.
6.3.2 Wall Mounting the Base Station
Follow the steps below to mount the base station to a wall.
Be sure the wall material can hold the weight of the base.
1. Hold the base in its final location and mark the screw location based on the measurements shown
in
Figure 2-146 Base Mounting Dimensions on the next page
.
Figure 2-145 Connecting the Base Station
ISSUE 1.0
SL1100
Installation
2-90
Summary of Contents for SL1100
Page 2: ......
Page 3: ...Hardware Manual A50 031693 003 NA ISSUE 1 0 September 2011...
Page 9: ...2 18 Cable Requirements 5 7 TABLE OF CONTENTS Hardware Manual v...
Page 22: ...Memo ISSUE 1 0 SL1100 Regulatory R 8...
Page 136: ...Memo ISSUE 1 0 SL1100 System Start Up 3 8...
Page 156: ...Memo ISSUE 1 0 SL1100 Specifications 5 8...