
34
1. Before Setting Up Your Projector
1-8-3. Procedure for connecting the power cable (C2 connection)
Preparation:
Phillips-head screwdriver (No. 2), service key (projector accessory)
WARNING
Before connecting the power cable, make sure that the AC power supply is disconnected. Otherwise a fire or
electric shock may occur.
1. Follow steps to in “1-8-2. Procedure for connecting the power cable (C1 connection)” (page
).
2. Configure the power supply for C2 connection.
For C2 connection, connect the outer-side connector.
Connect
Connect
3. Return the power connector and the fixing bracket to their original position, and fix the fixing screws (at
two points).
4. Fix the plate inlet with the fixing screws (at six points).