DOD-PD-1261 (2nd edition)
4
2. REPLACEMENT PROCEDURE
2.1 PREPARATION
The following facilities and tools are required.
(1) Finger stalls (glove)
(2) Grounding band (earth band)
(3) Workbench which is covered with conductive mat (workbench equipped to be prevent static
charges can be used)
(4) Radio pliers, tweezers
(5) Replacing parts
LCD Module
Lamp holder set
NL3224BC35-20/22 55LHS11
2.2 REGARDING THE LAMP HOLDER SET
(1) One set consists of two holders.