Page 10
Circuit Description
NEC-FA150ATUA
9.6 Power ON sequence
When the POWER switch is pressed, the POWER OFF signal is turned H. When this H potential is detected,
the CPU begins to establish the respective power supplies according to the sequence shown below.
uP POWER
Panel_VCTL
Panel_CLK
BLON
LED
Panel Data