
Issue 2 December 1995
7-5
Administer Analog Voice Mail Ports
9. In the RSC (Route Restriction Class) field, you see a default value of 0.
Enter the correct RSC. After you press
the cursor moves to the SFC
field.
Contact your switch system administrator to determine if the default value
is correct.
10. In the SFC (Service Feature Class) field, you see a default value of 0. Enter
the correct SFC.
Contact your switch system administrator for the correct SFC value.
11. When you finish editing the final field, press
to
confirm
the
station
administration.
12. When you assign the first station data command for a Line Package, the
message
PKG CHECK
appears on the screen.
Check that the correct circuit card is in the correct slot and press
.
After you press
the
cursor
returns to the first field.
If you continue to assign station data commands to the same Line
Package, you receive a
WRT?
message after entering the station
information.
Enter Y to confirm the information. After you press
the
cursor
returns to the first field.
13. Repeat steps 5 through 12 for each analog voice mail port you need to
assign. For example, if you have already assigned extension 500 but you
still need to assign extensions 501, 502, and 503, return to Step 5 and
enter 501 as the second extension. Repeat the process until 502 and 503
have been assigned. When you finish entering the analog voice mail port
numbers, press
to return to the Station Data Commands menu.
Proceed to the next section, “Assign Voice Mail Extensions to a UCD
Group.”
ENTER
ENTER
ENTER
ENTER
ENTER
/
Summary of Contents for NEAX 2400
Page 2: ...Blank Page ...
Page 8: ...Contents viii Issue 2 December 1995 ...
Page 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics ...
Page 42: ...3 6 Issue 2 December 1995 Switch Integration Planning ...
Page 52: ...4 10 Issue 2 December 1995 Hardware Installation ...
Page 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration ...
Page 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration ...
Page 122: ...A 10 Issue 2 December 1995 ...
Page 128: ...B 6 Issue 2 December 1995 ...