
Issue 2 December 1995
6-5
Administering the Switch Link Administration Screen
6. Press
(F3).
After you press the key, you receive a confirmation message as shown in
Figure 6-4. The message tells you that the serial port was registered
successfully and that you need to stop and restart the voice system
Figure 6-4
Switch Link Administration Confirmation Message
7. Press
(F6) until you see the INTUITY Administration menu as
shown in the Figure 6-1.
8. Proceed to the next section, "Stopping and Restarting the Voice System".
SAVE
CANCEL
Summary of Contents for NEAX 2400
Page 2: ...Blank Page ...
Page 8: ...Contents viii Issue 2 December 1995 ...
Page 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics ...
Page 42: ...3 6 Issue 2 December 1995 Switch Integration Planning ...
Page 52: ...4 10 Issue 2 December 1995 Hardware Installation ...
Page 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration ...
Page 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration ...
Page 122: ...A 10 Issue 2 December 1995 ...
Page 128: ...B 6 Issue 2 December 1995 ...