ND-70185 (E)
CHAPTER 6
Page 143
Revision 3.0
POST INSTALLATION TEST
Fusion and Non-Fusion Connection Tests
3.5.1
Primary Route Trunk Test
STEP 1:
Using the MBCT command, make busy all trunks in the primary route except the trunk to be tested.
STEP 2:
Lift the handset of STN A in self-node (Node A).
STEP 3:
Dial the Telephone Number of STN B which belongs to other node (STN B).
STEP 4:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 5:
Replace the handset of STN A.
STEP 6:
Make idle all the trunks which were placed in make-busy state in STEP 1.
3.5.2
Alternate Route Trunk Test
STEP 1:
Using the MBCT command, make busy all trunks in the primary route.
STEP 2:
Using the MBCT command, make busy all trunks in the alternate route except the trunk to be tested.
STEP 3:
Lift the handset of STN A.
STEP 4:
Dial the Telephone Number of STN B.
STEP 5:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 6:
Replace the handset of STN A.
STEP 7:
Make idle all the trunks which were placed in make-busy state in STEP 1 and STEP 2.
Figure 6-12 Fusion Alternate Routing Test
4. Fusion and Non-Fusion Connection Tests
Use the following procedures to perform the connection test between the FCCS and non-Fusion Common Chan-
nel Interoffice Signaling (CCIS) or Associated Channel Interoffice Signaling (ACIS):
Check
Check
Primary Route
FCCS
FCCS
STN A
TELN: 410000
STN: 2000
STN B
TELN: 420000
STN: 2000
Node A
(Self-Node)
Node B
Node C
Node D
Alternate Route