Setting Up the System 2-7
Installation Procedure
Perform the following procedures to install the server into the rack:
Removing the Rail Assemblies
1.
The rail assemblies may be shipped already mounted to the sides of the
server. Each rail assembly consists of a stationary rail attached to the server
and a removable sliding rail. Following Steps 2 and 3, remove the sliding
rails from the server.
Note:
The removed rail assemblies are to be installed on the inner
rails later. To install each rail assembly on the correct inner rail, mark
each rail as removed. Similarly, when installing more than one server,
distinguish between the pairs of inner rails and rail assemblies of the
servers by marking the left and right hand rails.
2.
Hold the rails and slowly slide them toward the rear of the server until a
"click" is heard. The click indicates that the rails are in the locked position.
3.
Push the release levers on the right and left sides of the rails (Figure 2-2, A),
and remove the sliding rail assemblies from the server.
A
Figure 2-2. Removing the Rail Assemblies from the Server
Note:
The inner stationary rails remain screwed to the
server when the rail assemblies have been removed. See
Figure 2-3.
Summary of Contents for EXPRESS5800/120Re-2
Page 1: ... S e r v i c e G u i d e EXPRESS5800 120Re 2 ...
Page 2: ...xxx ...
Page 3: ... S e r v i c e G u i d e EXPRESS5800 120Re 2 ...
Page 10: ...viii Contents INDEX ...
Page 30: ......
Page 59: ...Setting Up the System 2 29 Figure 2 34 Making Connections ...
Page 78: ......
Page 178: ......
Page 200: ...5 22 Problem Solving ...
Page 201: ...6 Illustrated Parts Breakdown Exploded View Field Replaceable Units Cable List Upgrades ...
Page 210: ...6 10 Illustrated Parts Breakdown This page is intentionally left blank ...
Page 211: ...A Specifications System Specifications ...
Page 220: ......
Page 221: ...C Interrupt Requests ...
Page 232: ...10 Glossary ...
Page 237: ...xx ...
Page 238: ... 456 01599 000 ...