background image

Summary of Contents for Express 5800/120Ed

Page 1: ...Express5800 120Ed Rack Mount Kit Installation Procedures PN 455 01607 001 ...

Page 2: ...nce of each such product is dependent upon factors such as system configuration customer data and operator control Since implementation by customers of each product may vary the suitability of specific product configurations and applications must be determined by the customer and is not warranted by NEC Computers Inc To allow for design and specification improvements the information in this docume...

Page 3: ...Unit 7 Removing the Front Bezel 7 Removing the Side Panels 8 Installing the LED Holder and Labels 9 Removing a Foot Stand 13 Installing the New Front Bezel 15 Installing the Side Panels 18 Preparing the Mounting Bracket Assemblies 19 Attaching the Mounting Bracket Assembly to the Rack 19 Installing the Server into the System Rack 21 Making Connections 23 Connecting the Power Cord 24 Powering On Yo...

Page 4: ......

Page 5: ...llation Procedures 3 Introduction This guide provides you with assembly information for preparing and mounting your Express5800 120Ed Server small tower unit into a system rack see Figure 1 Figure 1 Rack Mounted Server Small Tower Unit ...

Page 6: ...sentative 3 Save the container and packing materials for any future reshipment Table 1 Rack Mount Kit Parts List NZA 1203 00 00 Item Name Description Part Number A Rail Kit 1U Rail Kit includes Left Mounting Rail 246 01521 000 Right Mounting Rail 246 01522 000 Packet of screws 250 0151 000 246 01523 000 B Front Bezel Bezel assembly C Plastic Bag Plastic bag containing four screws and two bezel ass...

Page 7: ...Express5800 120Ed Rack Mount installation Procedures 5 B C D E G Express5800 120Ed A F H Figure 2 Rack Mount Kit Parts ...

Page 8: ...erify that the reassembly was performed correctly If the problem persists see the Problem Solving chapter in your System User s Guide What You Need In addition to the carton contents the only tools you need are a 2 Phillips adjustable crescent wrench and a utility knife to assemble the server unit CAUTION It is strongly recommended that two people are present when lifting and installing the server...

Page 9: ...items are removed then the new front bezel for rack mounting can be installed on the front of the server unit Removing the Front Bezel CAUTION If you are removing the front bezel after the server unit is set up you must first power off the system and all external devices Unplug the system power cord The plastic front bezel assembly on your server unit is a one piece assembly and easy to remove Not...

Page 10: ...rd To remove a side panel 1 Power off the server unit and ensure it is disconnected from the ac wall outlet 2 The side panel is secured to the chassis with three screws Remove the screws see Figure 4 securing the side panel Save the screws for reattaching the side panel 3 Slide the side panel toward the rear of the chassis This unlocks the locking fingers behind the side panel 4 Pull the side pane...

Page 11: ...ht hand side of the server chassis A name plate logo and two other labels are then adhered to the new front bezel of the server unit To install the LED Holder and labels perform the following 1 Power off the system and ensure it is disconnected from the ac wall outlet 2 Remove the front bezel as described earlier in this guide 3 Remove the side panels as described earlier in this guide 4 Remove th...

Page 12: ...he LED holder see Figure 6 Power HDD Figure 6 Removing LEDs from the LED Holder 6 Feed the Power and HDD LED cable assemblies back through the mounting hole in the front of the chassis 7 Reroute the power and HDD LEDs through hole on the right side of the chassis then into the new LED holder mounting hole slot located on the front right hand side of the chassis See Figure 8 ...

Page 13: ...e new LED holder see Figure 7 Figure 7 Inserting the Relocated LEDs into the New LED Holder 9 Insert the bottom tab of the new LED holder into the mounting hole slot in the front of the chassis while pushing down on the top tab of the holder and snap the LED holder into place see Figure 8 Figure 8 Installing the New LED Holder ...

Page 14: ...to its mounting hole slot while pushing down on the top tab of the holder and snap the LED holder into place 11 On the front of the new bezel adhere the three new labels as shown in Figure 9A B and C A B C Express5800 120Ed Figure 9 Attaching the New Labels to the Front Bezel Note The Status LED is now viewed through the new front bezel panel ...

Page 15: ...lier in this chapter 2 Position the server unit on its right side 3 Remove the two screws securing the foot stand to the bottom of the server unit The two screws are located inside on the bottom of the server unit Note If an option card is installed in the bottom expansion slot of the server unit it may be necessary to remove the option card before the hex screw can be removed that is located unde...

Page 16: ...ess5800 120Ed Rack Mount installation Procedures 14 Top Bottom A B C D E Figure 10 Removing a Foot Stand Item Description A Long Stem Nut B Movable Stand C Stationary Base D Hex Screw E Phillips Head Screw ...

Page 17: ... Position the server unit on its right side Figure 11 Install the Front Bezel Handles 3 Install two handles onto the new front bezel with the four screws supplied See Figure 11 4 Remove the Device Bay Door located on the front of the new front bezel see Figure 12 Loosen the captive spring screw and slide the door out of the front bezel Note Save the door for reinstallation ...

Page 18: ... see Figure 13 If necessary loosen the screws on the bottom screw brackets of the front bezel so that the tab hooks can be easily aligned to go into the bottom tab slots of the server unit CAUTION Be careful not to damage LEDs protruding out from the front of the chassis 7 Pivot the top edge of the front bezel up towards the top edge of the server unit until its top metal tabs protrude through the...

Page 19: ... three screw holes underneath the bottom of the front bezel and loosen the screws see Figure 14 Firmly hold the bottom of the bezel flush against the bottom of the server chassis and tighten the screws This will correctly align the front bezel to the server chassis Figure 14 Aligning the Front Bezel to the Server Unit ...

Page 20: ...ing the Side Panels 1 Before replacing the side panels make sure no tools or loose parts have been left inside the server unit 2 Make sure all option boards are firmly seated in their respective slots and that all interior cables are properly connected inside the server unit 3 Insert the metal locking fingers on the top and bottom of the side panel into their slots on the chassis Slide the side pa...

Page 21: ...eferring to Figure 16 remove any screws securing the front mounting bracket A to the rear mounting bracket B Perform this step on the right rail assembly 2 Select an appropriate location in the rack cabinet for the rack mount server To improve rack stability mount heavier items towards the bottom of the rack cabinet Note When planning the server configuration for the rack cabinet you should consid...

Page 22: ...lied 4 Attach the left front and rear mounting brackets to each other using three of the Phillips head self tapping screws and flat washers supplied See Figure 18 Figure 18 Securing the Front and Rear Mounting Brackets 5 Attach the right front and rear mounting brackets to each other using three of the Phillips head self tapping screws and flat washers supplied 6 Securely tighten the all Phillips ...

Page 23: ...ou have someone help you lift or move the system WARNING Ensure that the location of the rack mount server unit does not create an unstable condition when installed in the rack cabinet 1 Lift the rack mount server unit Figure 19 C onto the two support brackets and slide it toward the rear of the rack cabinet WARNING It is strongly recommended that two people are present when lifting and assembling...

Page 24: ...Mount installation Procedures 22 A Rear vertical mounting rail B Front vertical mounting rail C Rack mount server unit D Four plastic washers E Four screws Figure 19 Installing the Rack Mount Server Unit into the Rack Cabinet ...

Page 25: ...l devices such as a printer or modem by following the instructions included with these devices CAUTION Damage to the system may result if the keyboard mouse cable is inserted or removed when power is applied to the system Inserting a telephone line connector into a LAN board RJ 45 port may result in personal injury and equipment damage 1 2 Figure 20 Making Connections ...

Page 26: ...ting of the system The power cord connector that plugs into the wall outlet must be terminated in a grounding type male plug designed for use in your region It must have certification marks showing certification by an agency acceptable in your region The power cord connector that plugs into the system must be an IEC type CEE 22 female connector The power cord must be less than 1 8 meters 6 0 feet ...

Page 27: ...ence a 1 5 second delay from the time you press the push button power on off switch on the front panel and your system powering down This is normal system operation and is required by the server management logic After a few seconds your system begins the internal Power On Self Tests POST POST automatically checks the system board CPU module memory keyboard and most installed peripheral devices CAU...

Page 28: ......

Page 29: ......

Reviews: