Express5800/120Ed Rack Mount installation Procedures 18
10.
Reinstall the “Device Bay Door” on the front bezel and secure with the
captive spring screw (see Figure 15).
Figure 15. Installing the Device Bay Door
11.
Install the side panel on the server unit as described later in this section.
Installing the Side Panels
1.
Before replacing the side panels, make sure no tools or loose parts have been
left inside the server unit.
2.
Make sure all option boards are firmly seated in their respective slots and
that all interior cables are properly connected inside the server unit.
3.
Insert the metal locking fingers on the top and bottom of the side panel into
their slots on the chassis. Slide the side panel forward as far as it will go.
4.
Replace the three side panel retaining screws
(see Figure 4).
Summary of Contents for Express 5800/120Ed